Ready for Main Floor Walls

Re-Bar is poured into the top of the basement walls in preparation for the main floor ICF blocks to be stacked.
Hydronic heating lines in the main floor are now neatly tied to their manifold as well.

Side Wall – Ready to Stack

Center Wall – Ready to Stack

Main Floor Hydronic Manifold




Leave Comment

Your email address will not be published. Required fields are marked

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <s> <ins> <strong>