Second Backfill

Now that the front window well walls have been poured we proceed with the second backfill.  Now trades and visitors can walk into the homes at grade both in the font and the back as well as around the building via a gentle slope down the side yards.

Front yard backfill

Front door entry at grade

West side yard

East side yard

Front yard




Leave Comment

Your email address will not be published. Required fields are marked

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <s> <ins> <strong>