Interior Framing & Window Prep

The interior framing continues and the windows get moved into the houses to prepare for the installation of these European tilt and turn beauties.

20120817_0556

Main floor bedrooms and connecting hallway

20120817_0474

Windows are lifted with the zoom-boom to their respective rooms

20120817_0491

The next window load on the zoom-boom below

20120817_0543

Window racks are almost empty now

 