More ICF Blocks Haus 8 & 10 Apr 12 Written By Now that the basement is done an other load of ICF (insulated concrete forms) is delivered to build the next level, the main floor.
More ICF Blocks Haus 8 & 10 Apr 12 Written By Now that the basement is done an other load of ICF (insulated concrete forms) is delivered to build the next level, the main floor.