1st Driveway Poured

The first of two rear driveways is now poured... these lead to the over-sized triple attached under-drive garages in these homes. Enough room for ALL your toys!The first retaining wall concrete is poured on the west unit at the same time.20130902_000120130902_000420130902_0003

Previous
Previous

Trees are at the Haus

Next
Next

Starting to Tile